Projects
Completed Projects
Şırnak Dam
It was constructed in Şenoba town in Şırnak province. Scope of the work includes the works of the dam bisque, cut-and-cover derivation, penstock pipe, water stilling device, injection operations and the spillway productions.
KAVŞAKTEPE Dam
Kavşaktepe Dam is located by Robozik watercourse in Uludere district of Şırnak Province in Southeastern Anatolia Region.
ADIYAMAN – ŞİFRİN HPP
The manufacturing of regulator building, transmission tunnel, transmission channel, penstock pipe and central building works were completed.
ARDAHAN - HANAK HPP
The location and the scope of the work: Hanak 1 and Hanak 2 HPP are located by Alabalık watercourse in Hanak district of Ardahan province.
YOZGAT – GÜLİSTAN LAGOON
All the manufactures of injection works were completed in Yozgat province, by Haraka watercourse for Gülistan Lagoon.
AĞRI – PATNOS ROAD CONSTRUCTION
The land works, art structures, basement, sub-basement, bitumen how mixture manufactures between Ağrı – Hamur – Tutak – Patnos highway at 53+000-79+370 km.
DİYARBAKIR – SİVEREK ROAD CONSTRUCTION
Various ground and infrastructure works on some sections of Diyarbakır – Siverek highways.
DİYARBAKIR – SİLVAN ŞEHİR İÇİ ROAD CONSTRUCTION
Land works, art structures and ground works between Silvan – Malabadi – Haydarköprü – 11th Region Border 0+000-8+000 km
SİİRT ÜNİVERSİTY INFRASTRUCTURE CONSTRUCTION
It is the work for the construction of all the infrastructure and roads in Siirt University Campus.
VAN PREFABRICATED HOUSES
The prefabricated building infrastructure works in Van Province, Edremit district for 300 units in 173.849m² according to the technical specifications and the project of the General Directorate of Security Affairs.
ERYAMAN – TOKI
The construction works of a School with 32 classrooms, Sports Hall and Mosque in Eryaman, Ankara were completed.
Contact
Adres
1324. Cadde No:26
Aşağı Öveçler / ANKARA
info@malamira.com
+90 0 312 473 00 90
+90 (0 312) 472 52 39