AĞRI – PATNOS ROAD CONSTRUCTION
- NAME OF THE WORK:: AĞRI – PATNOS ROAD CONSTRUCTION
- EMPLOYER: 12th REGIONAL DIRECTORATE OF HIGHWAYS
- CONTRACT DATE: 01.10.2010
- DUE DATE: 24.01.2014
AĞRI – PATNOS ROAD CONSTRUCTION
The land works, art structures, basement, sub-basement, bitumen how mixture manufactures between Ağrı – Hamur – Tutak – Patnos highway at 53+000-79+370 km.
Contact
Adres
1324. Cadde No:26
Aşağı Öveçler / ANKARA
info@malamira.com
+90 0 312 473 00 90
+90 (0 312) 472 52 39